top of page
Search
  • SUSI

Are you an academic with a passion in digital connectivity, renewable energy, 5G and beyond?

Updated: Jul 19, 2022

A green, connected and prosperous Britain project is aiming at embedding 5G and its advantages into the local and national Grid, empowering prosumers, egressing resilience, flexibility at local and national levels.

Through a series of feasibility trials the network will grow a larger scale system for demonstration and testing, informing industry and beyond of the capabilities available for better integration across multiple levels.

Flexible funds are now available for Feasibility Study projects (3-6 months), deadline 12 August 2022.

Please read the Feasibility Studies Phase1 GUIDELINES-GCPB Network for more details, and download the application forms (two parts) use the links below:

120 views0 comments

Recent Posts

See All

Sussex team - Paper accepted!

Our team at the University of Sussex has been informed by the IEEE VNC 2023 that their paper "Towards Net-Zero Goal Through Altruistic Prosumer Based Energy Trading Among Connected Electric Vehicles"

bottom of page